Crystal Pools and Spas Construction Procedure
|
Form Pool Dig Pool 1ST DRAW DUE
Steel Pool Pool Steel Inspection Shoot Pool Shell 2ND DRAW DUE
Strip Forms Grade Dirt Tile Pool Plumb Pool Form Pool Deck Deck Grounding Inspection Pour Pool Deck Set Pool Equipment Wire Pool Equipment 3RD DRAW DUE
Acrylic 1st coast Screen Enclosure Safety Inspection-Someone Will Need To Be Home To Let The Inspector Inside Prep Pool Interior Plaster Pool Acid wash Interior Start hose-Fill Non-stop From Deep End To Shallow End Balance Water Clean Up Pool/Yard/Final Clean up Acrylic Last Coat Pool Instructions Final Inspection FINAL DRAW DUE
|
|